In the field and in the site office
One tap per work package, right in the cabin. Offline is the ground rule: Sightyard works on the device and syncs as soon as there is a connection. The site office sees the same status in the cabin train, in performance and in acceptance.
Three gates per cabin
Pre, First and Final inspection are gates. Each sign-off carries a name and a time. The owner signs First and Final by policy, class signs off by policy, and both raise punch.
The acceptance view shows the funnel Pre, First, Final and the inspection load of the coming weeks against QC capacity.
Punch list
- Defect with photo, fix, re-check.
- Status per item, overdue items first.
- Grouped by inspection, deck, cabin or trade.
- Contractors and suppliers work off their own punch.
Schedule, awarding and performance
- Schedule. Baseline frozen, forecast moves, actuals measured. Reschedule with preview and audit.
- Awarding. Award by work package, deck and cabin type. The matrix shows every gap.
- Performance. Completion, SPI, open punch, forecast finish, S-curve and status mix per selection.
How the cabin train reads flow and takt: takt planning in ship outfitting. The whole platform: outfitting control.