From defect to sign-off
- 1 Raise the defect with a photo, right where it is. Offline on site.
- 2 The responsible trade or supplier fixes it.
- 3 The item is checked again.
- 4 The Final is signed once the punch is closed.
Overview for site management
- Status per item, overdue items first.
- Grouped by inspection, area or trade.
- Owner and inspectors raise punch by policy, contractors and suppliers work off their own.
- Every action logged with user and time.
Part of construction control
Punch is step four of five: Capture, Check, Inspect, Punch, Accept. Open punch also steers the work: each trade pulls its lot from what is released for it, and open punch comes first. More: construction control, punch in cabin outfitting.